2024 BMW M3 COMPETITION

VIN: WBS33AY07RFS03937

Auction Date Final Bid Reserve Status Bidder
2025-10-29
$ 34 350
On Approval
SULEJOW-XX

2024 BMW M3 WBS33AY07RFS03937 Photo 0

2024 BMW M3 WBS33AY07RFS03937 Photo 1

2024 BMW M3 WBS33AY07RFS03937 Photo 2

2024 BMW M3 WBS33AY07RFS03937 Photo 3

2024 BMW M3 WBS33AY07RFS03937 Photo 4

2024 BMW M3 WBS33AY07RFS03937 Photo 5

2024 BMW M3 WBS33AY07RFS03937 Photo 6

2024 BMW M3 WBS33AY07RFS03937 Photo 7

2024 BMW M3 WBS33AY07RFS03937 Photo 8

2024 BMW M3 WBS33AY07RFS03937 Photo 9

2024 BMW M3 WBS33AY07RFS03937 Photo 10

 

Car details:



Engine:

3.0L I-6 DI, DOHC, VVT, turbo, 503HP
Fuel type:

Gasoline
Odometer:

22 694 mi / 36 310 km
Start code:

Run & Drive
Airbags:

Deployed Airbags
Transmission:

Automatic
Drive:

Rear Wheel Drive
Key:

Key Available
Title:

Salvage
Loss:

Collision
Damage:

Right Side & RIGHT FRONT
Seller:

State Farm Group Insurance

Bid info:



Last auctioned on:
auction logo

2025-10-29



North Hollywood
(towing: $320 to: Los Angeles, CA)

Final offer: $ 34 350

On Approval


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M3
Model Year
2024
Series
3-Series
Trim
M3 Competition
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
MUNICH
Body Class
Sedan/Saloon
Doors
4
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Vehicle Descriptor
WBS33AY0*RF
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
6
Displacement (CC)
3000
Displacement (CI)
183.0712322841
Displacement (L)
3
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
543
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All positions / Pretensioners, Side Airbags, Head Inflatable Restraint: Front Row & Rear Outboard Driver-side, Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st and 2nd Rows
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Keyless Ignition
Standard
Adaptive Cruise Control (ACC)
Optional
Crash Imminent Braking (CIB)
Standard
Forward Collision Warning (FCW)
Standard
Dynamic Brake Support (DBS)
Standard
Pedestrian Automatic Emergency Braking (PAEB)
Standard
Blind Spot Warning (BSW)
Standard
Lane Departure Warning (LDW)
Standard
Backup Camera
Standard
Parking Assist
Standard
Rear Automatic Emergency Braking
Standard
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
NCSA Body Type
4-door sedan, hardtop
NCSA Make
BMW
NCSA Model
3-series


© 2024 usa-vin.com      |      Contact