2023 BMW M4 CSL

VIN: WBS63AZ05PCM07503

Auction Date Final Bid Reserve Status Bidder
2026-02-23
$ 37 000
On Approval
WI, US
2026-03-02
$ 40 250
On Approval
WI, US

2023 BMW M4 WBS63AZ05PCM07503 Photo 0

2023 BMW M4 WBS63AZ05PCM07503 Photo 1

2023 BMW M4 WBS63AZ05PCM07503 Photo 2

2023 BMW M4 WBS63AZ05PCM07503 Photo 3

2023 BMW M4 WBS63AZ05PCM07503 Photo 4

2023 BMW M4 WBS63AZ05PCM07503 Photo 5

2023 BMW M4 WBS63AZ05PCM07503 Photo 6

2023 BMW M4 WBS63AZ05PCM07503 Photo 7

2023 BMW M4 WBS63AZ05PCM07503 Photo 8

2023 BMW M4 WBS63AZ05PCM07503 Photo 9

2023 BMW M4 WBS63AZ05PCM07503 Photo 10

 

Car details:



Engine:

3.0L I-6 DI, DOHC, VVT, turbo, 543HP
Fuel type:

Gasoline
Odometer:

29 647 mi / 47 435 km
Start code:

Run & Drive
Airbags:

Transmission:

Automatic
Drive:

Rear Wheel Drive
Key:

Key Available
Title:

Salvage
Loss:

Collision
Damage:

Front & Rear & LEFT REAR
Seller:

Progressive Casualty Insurance

Bid info:



Last auctioned on:
auction logo

2026-03-02



Dream Rides


Final offer: $ 40 250

On Approval


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M4
Model Year
2023
Series
4-Series
Trim
CSL
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
DINGOLFING
Body Class
Coupe
Doors
2
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Vehicle Descriptor
WBS63AZ0*PC
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
6
Displacement (CC)
3000.0
Displacement (CI)
183.07123228419
Displacement (L)
3.0
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
543
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All Positions / Pretensioners, Side Airbag, & Head Inflatable Restraints: Driver, Front Passenger, Rear Outboard Driver-side, & Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st and 2nd Rows
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Event Data Recorder (EDR)
Standard
Keyless Ignition
Standard
Adaptive Cruise Control (ACC)
Optional
Crash Imminent Braking (CIB)
Standard
Blind Spot Warning (BSW)
Standard
Lane Departure Warning (LDW)
Standard
Lane Keeping Assistance (LKA)
Optional
Lane Centering Assistance
Standard
Backup Camera
Standard
Rear Cross Traffic Alert
Optional
Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
Standard
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
NCSA Body Type
2-door sedan,hardtop,coupe
NCSA Make
BMW
NCSA Model
4-Series


© 2024 usa-vin.com      |      Contact