2023 BMW M3 COMPETITION

VIN: WBS33AY03PFN37704

Auction Date Final Bid Reserve Status Bidder
2026-02-02
$ 30 400
On Approval
NJ, US
2026-02-09
$ 33 750
On Approval
FL, US

2023 BMW M3 WBS33AY03PFN37704 Photo 0

2023 BMW M3 WBS33AY03PFN37704 Photo 1

2023 BMW M3 WBS33AY03PFN37704 Photo 2

2023 BMW M3 WBS33AY03PFN37704 Photo 3

2023 BMW M3 WBS33AY03PFN37704 Photo 4

2023 BMW M3 WBS33AY03PFN37704 Photo 5

2023 BMW M3 WBS33AY03PFN37704 Photo 6

2023 BMW M3 WBS33AY03PFN37704 Photo 7

2023 BMW M3 WBS33AY03PFN37704 Photo 8

2023 BMW M3 WBS33AY03PFN37704 Photo 9

2023 BMW M3 WBS33AY03PFN37704 Photo 10

 

Car details:



Engine:

3.0L I-6 DI, DOHC, VVT, turbo, 503HP
Fuel type:

Gasoline
Odometer:

45 311 mi / 72 498 km
Start code:

Run & Drive
Airbags:

Intact Airbags
Transmission:

Automatic
Drive:

Rear Wheel Drive
Key:

Key Available
Title:

Bill Of Sale
Loss:

Collision
Damage:

Front End & RIGHT SIDE
Seller:

Progressive Casualty Insurance

Bid info:



Last auctioned on:
auction logo

2026-02-09



Dream Rides


Final offer: $ 33 750

On Approval


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M3
Model Year
2023
Series
3-Series
Trim
M3 Competition
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
MUNICH
Body Class
Sedan/Saloon
Doors
4
Gross Vehicle Weight Rating From
Class 1C: 4,001 - 5,000 lb (1,814 - 2,268 kg)
Vehicle Descriptor
WBS33AY0*PF
Engine Number of Cylinders
6
Displacement (CC)
3000.0
Displacement (CI)
183.07123228419
Displacement (L)
3.0
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
503
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All Positions / Pretensioners & Head Inflatable Restraints: Driver, Front Passenger, Rear Outboard Driver-side, & Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st Row (Driver and Passenger)
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Event Data Recorder (EDR)
Standard
Keyless Ignition
Standard
Crash Imminent Braking (CIB)
Standard
Forward Collision Warning (FCW)
Standard
Pedestrian Automatic Emergency Braking (PAEB)
Standard
Blind Spot Warning (BSW)
Optional
Lane Departure Warning (LDW)
Optional
Backup Camera
Standard
Parking Assist
Optional
Rear Cross Traffic Alert
Optional
Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
Standard
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
Adaptive Driving Beam (ADB)
Standard
NCSA Body Type
4-door sedan, hardtop
NCSA Make
BMW
NCSA Model
3-series


© 2024 usa-vin.com      |      Contact