2022 BMW M3 COMPETITION

VIN: WBS33AY07NFM37814

Auction Date Final Bid Reserve Status Bidder
2026-03-09
$ 38 800
On Approval
TX, US

2022 BMW M3 WBS33AY07NFM37814 Photo 0

2022 BMW M3 WBS33AY07NFM37814 Photo 1

2022 BMW M3 WBS33AY07NFM37814 Photo 2

2022 BMW M3 WBS33AY07NFM37814 Photo 3

2022 BMW M3 WBS33AY07NFM37814 Photo 4

2022 BMW M3 WBS33AY07NFM37814 Photo 5

2022 BMW M3 WBS33AY07NFM37814 Photo 6

2022 BMW M3 WBS33AY07NFM37814 Photo 7

2022 BMW M3 WBS33AY07NFM37814 Photo 8

2022 BMW M3 WBS33AY07NFM37814 Photo 9

2022 BMW M3 WBS33AY07NFM37814 Photo 10

 

Car details:



Engine:

3.0L I-6 DI, DOHC, VVT, turbo, 503HP
Fuel type:

Gasoline
Odometer:

32 414 mi / 51 862 km
Start code:

Stationary
Airbags:

Intact Airbags
Transmission:

Automatic
Drive:

Rear Wheel Drive
Key:

Key Available
Title:

Clear
Loss:

Collision
Damage:

Rear &
Seller:

Progressive Casualty Insurance

Bid info:



Last auctioned on:
auction logo

2026-03-09



Dream Rides


Final offer: $ 38 800

On Approval


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M3
Model Year
2022
Series
3-Series
Trim
M3 Competition
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
MUNICH
Body Class
Sedan/Saloon
Doors
4
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Number of Seats
5
Number of Seat Rows
2
Transmission Style
Automatic
Transmission Speeds
8
Drive Type
RWD/Rear-Wheel Drive
Vehicle Descriptor
WBS33AY0*NF
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
6
Displacement (CC)
2992.2778864
Displacement (CI)
182.6
Displacement (L)
2.9922778864
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
503
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All Positions / Front/Rear: Pretensioner / Front/Rear: Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st Row (Driver and Passenger)
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Keyless Ignition
Standard
Adaptive Cruise Control (ACC)
Optional
Forward Collision Warning (FCW)
Standard
Blind Spot Warning (BSW)
Standard
Lane Departure Warning (LDW)
Standard
Lane Keeping Assistance (LKA)
Optional
Backup Camera
Standard
Parking Assist
Standard
Rear Cross Traffic Alert
Optional
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
Adaptive Driving Beam (ADB)
Standard
NCSA Body Type
4-door sedan, hardtop
NCSA Make
BMW
NCSA Model
3-series


© 2024 usa-vin.com      |      Contact