2020 BMW M4

VIN: WBS4Y9C0XLFH46575

Auction Date Final Bid Reserve Status Bidder
2025-12-11
$ 14 150
On Approval
IL, US

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 0

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 1

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 2

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 3

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 4

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 5

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 6

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 7

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 8

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 9

2020 BMW M4 WBS4Y9C0XLFH46575 Photo 10

 

Car details:



Engine:

3.0L I-6 DI, DOHC, VVT, turbo, 444HP
Fuel type:

Gasoline
Odometer:

69 145 mi / 110 632 km
Start code:

Stationary
Airbags:

Deployed Airbags
Transmission:

Automatic
Drive:

Rear Wheel Drive
Key:

Key Available
Title:

Salvage
Loss:

Collision
Damage:

Left & Right Side & FRONT END
Seller:

Unknown

Bid info:



Last auctioned on:
auction logo

2025-12-11



Hartford
(towing: $275 to: Elizabeth, NJ)

Final offer: $ 14 150

On Approval


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M4
Model Year
2020
Series
4-Series
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
MUNICH
Body Class
Coupe
Doors
2
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Number of Wheels
4
Steering Location
Left-Hand Drive (LHD)
Number of Seats
4
Number of Seat Rows
2
Drive Type
RWD/Rear-Wheel Drive
Axles
2
Vehicle Descriptor
WBS4Y9C0*LF
Wheel Base (inches) From
110.70
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
6
Displacement (CC)
2979.1682352
Displacement (CI)
181.8
Displacement (L)
3
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
425
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Pretensioners for Driver and Front Passenger.
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st Row (Driver and Passenger)
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Keyless Ignition
Standard
Dynamic Brake Support (DBS)
Standard
Backup Camera
Standard
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
NCSA Body Type
2-door sedan,hardtop,coupe
NCSA Make
BMW
NCSA Model
4-Series


© 2024 usa-vin.com      |      Contact