2021 BMW M3 SEDAN

VIN: WBS53AY08MFL00775

Auction Date Final Bid Reserve Status Bidder
2026-02-23
$ 26 300
On Approval
FL, US
2026-03-02
$ 24 550
On Approval
FL, US
2026-03-09
$ 25 850
On Approval
Tbilisi, XX

2021 BMW M3 WBS53AY08MFL00775 Photo 0

2021 BMW M3 WBS53AY08MFL00775 Photo 1

2021 BMW M3 WBS53AY08MFL00775 Photo 2

2021 BMW M3 WBS53AY08MFL00775 Photo 3

2021 BMW M3 WBS53AY08MFL00775 Photo 4

2021 BMW M3 WBS53AY08MFL00775 Photo 5

2021 BMW M3 WBS53AY08MFL00775 Photo 6

2021 BMW M3 WBS53AY08MFL00775 Photo 7

2021 BMW M3 WBS53AY08MFL00775 Photo 8

2021 BMW M3 WBS53AY08MFL00775 Photo 9

2021 BMW M3 WBS53AY08MFL00775 Photo 10

 

Car details:



Engine:

3.0L I-6 DI, DOHC, VVT, turbo, 473HP
Fuel type:

Gasoline
Odometer:

9 269 mi / 14 830 km
Start code:

Stationary
Airbags:

Deployed Airbags
Transmission:

Manual
Drive:

Rear Wheel Drive
Key:

Key Available
Title:

Salvage
Loss:

Collision
Damage:

Front End &
Seller:

Arbella Insurance Company

Bid info:



Last auctioned on:
auction logo

2026-03-09



Dream Rides


Final offer: $ 25 850

On Approval


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M3
Model Year
2021
Series
3-Series
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
MUNICH
Body Class
Sedan/Saloon
Doors
4
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Number of Wheels
4
Steering Location
Left-Hand Drive (LHD)
Number of Seats
5
Number of Seat Rows
2
Transmission Style
Automatic
Drive Type
RWD/Rear-Wheel Drive
Axles
2
Vehicle Descriptor
WBS53AY0*MF
Note
HD Radio, Bluetooth, Satellite Radio, Auxiliary Audio Input, MP3 Player
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
6
Displacement (CC)
2992.2778864
Displacement (CI)
182.6
Displacement (L)
2.9922778864
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
473
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All Positions / Front/Rear: Pretensioner / Front/Rear: Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st Row (Driver and Passenger)
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Keyless Ignition
Standard
Forward Collision Warning (FCW)
Standard
Dynamic Brake Support (DBS)
Standard
Blind Spot Warning (BSW)
Standard
Lane Departure Warning (LDW)
Standard
Backup Camera
Standard
Parking Assist
Optional
Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
Standard
Daytime Running Light (DRL)
Optional
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
NCSA Body Type
4-door sedan, hardtop
NCSA Make
BMW
NCSA Model
3-series


© 2024 usa-vin.com      |      Contact