2023 BMW M5

VIN: WBS83CH00PCL70074

Auction Date Final Bid Reserve Status Bidder
2025-11-05
$ 29 150
$ 27 850
Sold
CA, US

2023 BMW M5 WBS83CH00PCL70074 Photo 0

2023 BMW M5 WBS83CH00PCL70074 Photo 1

2023 BMW M5 WBS83CH00PCL70074 Photo 2

2023 BMW M5 WBS83CH00PCL70074 Photo 3

2023 BMW M5 WBS83CH00PCL70074 Photo 4

2023 BMW M5 WBS83CH00PCL70074 Photo 5

2023 BMW M5 WBS83CH00PCL70074 Photo 6

2023 BMW M5 WBS83CH00PCL70074 Photo 7

2023 BMW M5 WBS83CH00PCL70074 Photo 8

2023 BMW M5 WBS83CH00PCL70074 Photo 9

2023 BMW M5 WBS83CH00PCL70074 Photo 10

 

Car details:



Engine:

4.4L V-8 DI, DOHC, VVT, turbo, 617HP
Fuel type:

Gasoline
Odometer:

20 516 mi / 32 826 km
Start code:

Stationary
Airbags:

Deployed Airbags
Transmission:

Automatic
Drive:

All-Wheel Drive
Key:

Key Available
Title:

Loss:

Collision
Damage:

Right Front &
Seller:

Auto Club of Southern CA (ACSC)

Bid info:



Last auctioned on:
auction logo

2025-11-05



ACE - Carson
(towing: $225 to: Los Angeles, CA)

Final offer: $ 29 150

SOLD


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M5
Model Year
2023
Series
5-Series
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
DINGOLFING
Body Class
Sedan/Saloon
Doors
4
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Vehicle Descriptor
WBS83CH0*PC
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
8
Displacement (CC)
4400.0
Displacement (CI)
268.50447401682
Displacement (L)
4.4
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
600
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All Positions / Pretensioners & Head Inflatable Restraints: Driver, Front Passenger, Rear Outboard Driver-side, & Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st Row (Driver and Passenger)
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Event Data Recorder (EDR)
Standard
Keyless Ignition
Standard
Adaptive Cruise Control (ACC)
Optional
Crash Imminent Braking (CIB)
Standard
Forward Collision Warning (FCW)
Standard
Dynamic Brake Support (DBS)
Standard
Blind Spot Warning (BSW)
Standard
Lane Departure Warning (LDW)
Standard
Lane Keeping Assistance (LKA)
Standard
Backup Camera
Standard
Rear Cross Traffic Alert
Optional
Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
Standard
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
NCSA Body Type
4-door sedan, hardtop
NCSA Make
BMW
NCSA Model
5-series


© 2024 usa-vin.com      |      Contact