2021 BMW M5

VIN: WBS83CH05MCF83827

Auction Date Final Bid Reserve Status Bidder
2025-10-13
$ 30 250
$ 30 250
Sold
Kraczkowa-XX
2025-11-03
$ 21 700
On Approval
Kiev-XX
2025-11-10
$ 24 350
On Approval
Lviv, XX
2025-11-17
$ 30 900
$ 30 250
Sold
TX, US

2021 BMW M5 WBS83CH05MCF83827 Photo 0

2021 BMW M5 WBS83CH05MCF83827 Photo 1

2021 BMW M5 WBS83CH05MCF83827 Photo 2

2021 BMW M5 WBS83CH05MCF83827 Photo 3

2021 BMW M5 WBS83CH05MCF83827 Photo 4

2021 BMW M5 WBS83CH05MCF83827 Photo 5

2021 BMW M5 WBS83CH05MCF83827 Photo 6

2021 BMW M5 WBS83CH05MCF83827 Photo 7

2021 BMW M5 WBS83CH05MCF83827 Photo 8

2021 BMW M5 WBS83CH05MCF83827 Photo 9

2021 BMW M5 WBS83CH05MCF83827 Photo 10

 

Car details:



Engine:

4.4L V-8 DI, DOHC, VVT, turbo, 600HP
Fuel type:

Gasoline
Odometer:

75 136 mi / 120 218 km
Start code:

Run & Drive
Airbags:

Deployed Airbags
Transmission:

Automatic
Drive:

All-Wheel Drive
Key:

Key Available
Title:

Salvage
Loss:

Collision
Damage:

Right Front &
Seller:

Unknown

Bid info:



Last auctioned on:
auction logo

2025-11-17



Dream Rides


Final offer: $ 30 900

SOLD


ORDER CAR REPORT


Detailed car specification:



Make
BMW
Manufacturer Name
BMW M GMBH
Model
M5
Model Year
2021
Series
5-Series
Trim
M5/M5 Competition
Vehicle Type
PASSENGER CAR
Plant Country
GERMANY
Plant City
DINGOLFING
Body Class
Sedan/Saloon
Doors
4
Gross Vehicle Weight Rating From
Class 1: 6,000 lb or less (2,722 kg or less)
Steering Location
Left-Hand Drive (LHD)
Number of Seats
5
Number of Seat Rows
2
Transmission Style
Automatic
Transmission Speeds
8
Axles
2
Vehicle Descriptor
WBS83CH0*MC
Gross Vehicle Weight Rating To
Class 1: 6,000 lb or less (2,722 kg or less)
Engine Number of Cylinders
8
Displacement (CC)
4395.0105648
Displacement (CI)
268.2
Displacement (L)
4.3950105648
Fuel Type - Primary
Gasoline
Engine Brake (hp) From
600
Engine Brake (hp) To
617
Other Engine Info
M5 Comp: 617 hp / M5: 600 hp
Pretensioner
Yes
Seat Belt Type
Manual
Other Restraint System Info
Seat Belt: All Positions / Front/Rear: Pretensioner / Front/Rear: Head Inflatable Restraint: Rear Outboard Driver-side & Rear Outboard Passenger-side
Curtain Air Bag Locations
1st and 2nd Rows
Front Air Bag Locations
1st Row (Driver and Passenger)
Knee Air Bag Locations
1st Row (Driver and Passenger)
Side Air Bag Locations
1st Row (Driver and Passenger)
Anti-lock Braking System (ABS)
Standard
Electronic Stability Control (ESC)
Standard
Traction Control
Standard
Tire Pressure Monitoring System (TPMS) Type
Direct
Auto-Reverse System for Windows and Sunroofs
Standard
Keyless Ignition
Standard
Forward Collision Warning (FCW)
Standard
Dynamic Brake Support (DBS)
Standard
Blind Spot Warning (BSW)
Standard
Lane Departure Warning (LDW)
Standard
Lane Keeping Assistance (LKA)
Standard
Backup Camera
Standard
Parking Assist
Optional
Automatic Crash Notification (ACN) / Advanced Automatic Crash Notification (AACN)
Standard
Daytime Running Light (DRL)
Standard
Headlamp Light Source
LED
Semiautomatic Headlamp Beam Switching
Standard
Adaptive Driving Beam (ADB)
Standard
NCSA Body Type
4-door sedan, hardtop
NCSA Make
BMW
NCSA Model
5-series


© 2024 usa-vin.com      |      Contact